Zero-emission jobsites are becoming a priority in many European cities, with contractors switching excavators, loaders, dumpers and site vans to battery power. Electric machinery delivers its full benefit when the energy behind it is clean and available on site. MPMC's BCH Series mobile BESS chargers are built for this role: they store energy from the grid, solar PV or a low-carbon generator set and deliver fast DC charging to machines and vehicles, while also powering the site's cabins and tools.
BCH units accept energy from several sources. A temporary grid supply connects through CEE or PowerLock sockets, solar arrays connect through a dedicated solar input on the BCH-275-200 and larger models, and every model accepts a CCS2 DC input for fast recharging. Where no grid is available, MPMC's 400 kVA methanol distributed power station, controlled by a DEIF AGC150, combines with BCH units to form an integrated off-grid green power system for electric construction machinery.
The onboard blade LFP battery then delivers DC charging through CCS2 guns: 150 kW on the trailer-mounted BCH-275-200, and 400 kW to 600 kW on the BCH-600-400, BCH-800-600 and BCH-500-1000, each with two 350 A guns. Direct DC-side coupling, optimised for electric construction machinery, delivers up to 87% discharge efficiency.
The same unit supplies AC power for welfare cabins, lighting and tools, from 125 kW on the BCH-275-200 to 500 kW on the BCH-500-1000, so a zero-emission site can run its compound without a diesel generator set for routine loads.
Taken together, these three steps give a contractor a complete, battery-centred energy system for the site: clean energy in, fast charging out and silent compound power, all managed through one EMS with 4G connectivity and remote monitoring.
MPMC BCH-275-200 mobile BESS charger on a quarry site alongside electric construction machinery.Table 1. BCH models for zero-emission jobsites
| Model | DC charging | Storage | AC output | Jobsite role |
|---|---|---|---|---|
|
BCH-275-200 |
150 kW (2 x 250 A) |
203.5 kWh |
125 kW |
Compact machinery, site vans; easy relocation by trailer |
|
BCH-600-400 |
400 kW (2 x 350 A) |
407 kWh |
200 kW |
Excavators and loaders on mid-size sites |
|
BCH-800-600 |
600 kW (2 x 350 A) |
610.6 kWh |
200 kW, UPS-grade |
High-intensity charging; 1C performance |
|
BCH-500-1000 |
500 kW (2 x 350 A) |
1,075 kWh |
500 kW, UPS-grade |
Large sites and remote compounds |
Note: The table shows selected models; the BCH Series also includes the BCH-80-70 and BCH-60-70.
Construction sites are dusty, exposed and constantly changing. The BCH-275-200 uses a fully sealed liquid-cooled battery pack that keeps dust out, and the larger models use liquid-cooled packs suited to mines and construction sites, with an explosion-proof breather on the BCH-800-600 and BCH-500-1000. C4 anti-corrosion coating is standard, with C5 available on the larger models, and every unit reaches full operation within 24 hours of arrival. The battery is rated for 6,000 cycles at 90% depth of discharge and has been tested for fire, water immersion, collision and crushing.
MPMC BCH-800-600 heavy-duty mobile BESS charger, delivering up to 600 kW for electric construction machinery.In Norway, a 2 MWh BCH system lets a rental construction fleet operate electric machinery at a location with no grid access. Units of 500 kW and 1,000 kWh deliver CCS2 charging at 360 kW and 400 A, enabling zero-emission machine operation throughout the project.
The project shows how rental companies can offer zero-emission charging as a service to contractors, moving BCH units from one project to the next as sites open and close.
Table 2. Zero-emission jobsite needs and BCH capabilities
| Jobsite need | BCH capability | Result |
|---|---|---|
|
Machinery charging without grid |
Battery storage plus genset, methanol or solar input |
Electric machines work anywhere on site |
|
Clean compound power |
AC output 125-500 kW |
Cabins and tools run from stored energy |
|
Fast set-up |
Full operation within 24 hours |
Charging ready on day one |
|
Moving work fronts |
Trailer, heavy-duty and container formats |
Charging follows the work |
|
Remote oversight |
SCADA/EMS with 4G; OCPP 1.6 |
Site managers monitor every unit |
Equipment dealers and rental companies can add BCH units to their electric machinery offer, with OEM customisation and private-label arrangements available. BCH-275-200 and larger models carry a 3-year system warranty and a 5-year battery performance warranty with at least 70% capacity retention.
• List the electric machines and vehicles and their daily energy use
• Identify the energy source: grid, solar, methanol or genset
• Map compound loads that BCH AC output can supply
• Plan unit positions as the work front moves
• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a zero-emission site plan