The MPMC BCH Series BESS Charger (Battery Energy Storage & EV Charger) is a next-generation, fully integrated, ultra-safe, and plug-and-play green energy replenishment system engineered for global electric heavy-duty trucks, construction machinery, commercial buses, and specialized utility vehicles.
The BCH Series deeply integrates 200 kWh to 1,000 kWh (203.5 kWh – 1,075 kWh) lithium iron phosphate (LiFePO4) energy storage systems, 150 kW to 600 kW high-power DC ultra-fast charging modules, intelligent microgrid Energy Management Systems (EMS), and industrial-grade high-reliability protective enclosures (available with mobile trailer chassis or fixed containerized formats).
Comprising two core product matrices — Mobile and Fixed/Hybrid — the BCH Series delivers key capabilities including peak shaving, high-power DC fast charging, multi-standard AC emergency power supply, and multi-energy hybridization (Grid / Diesel Genset / Solar PV). Featuring a truly plug-and-play design with zero complex civil construction and no lengthy grid capacity expansion approvals required, it thoroughly resolves the critical pain points of "difficult charging, slow replenishment, and prohibitive costs" across off-grid, weak-grid, remote job sites, and temporary operating conditions.
Complete lineup of mobile and fixed BESS chargers engineered with 6,000+ cycle LFP battery storage, dual CCS2 guns, and flexible AC/DC grid integration.
High-voltage platform natively compatible with 400V, 800V, and 1000V commercial vehicles, electric mining trucks, and port machinery. Dual CCS2 guns support dynamic load balancing and liquid-cooled ultra-fast charging up to 600A.
Advanced hybrid microgrid synergy seamlessly integrating solar PV, backup diesel generators, and off-peak grid power. Intelligent power routing minimizes fuel consumption and maximizes clean solar energy capture.
Proprietary microgrid EMS with millisecond-level dynamic power dispatching. Equipped with 4G/IoT connectivity, remote OTA diagnostics, and standard OCPP 1.6 for seamless integration into third-party charging platforms.
Automotive-grade LiFePO4 cells delivering 6,000+ cycles (@90% DOD). Integrated with industrial LCAC precision thermal management, IP54 weatherproof enclosure, and CE-certified aerosol automatic fire suppression.
Skid-mounted or standard ISO container design with dedicated lifting points and optional mobile trailer. Deployable and ready to charge in under 60 minutes without foundation casting or transformer overhaul.
Empowering commercial fleet electrification with advanced Solar-Diesel-Storage-Grid hybrid microgrids across mobile job sites and permanent commercial hubs.
Engineered for high mobility, remote construction, temporary operations, and areas with zero grid infrastructure (BCH-275-200, BCH-600-400, BCH-600-600).
Combines on-site solar PV arrays and intermittent diesel generator runs to charge the battery buffer. Delivers instantaneous 400kW DC fast charging for electric excavators and heavy dump trucks while providing 200kW AC power for night site lighting and power tools.
Moves flexibly alongside advancing mining faces. Eliminates harmful diesel exhaust emissions in enclosed underground tunnels by providing clean, high-voltage fast charging for electric haulers and underground utility trucks.
Trailer-mounted mobile emergency charging unit capable of rapid dispatch to recover depleted electric buses, intercity coaches, and heavy freight haulers stranded on highways or urban rings.
Delivers continuous, whisper-quiet microgrid power by orchestrating clean solar storage with emergency backup diesel synchronization, ensuring zero-interruption power for medical stations, mobile command centers, and event fleets.
Designed for permanent depots facing grid transformer bottlenecks, high peak electricity tariffs, or demanding rapid station rollout (BCH-240-200, BCH-800-600, BCH-500-1000).
Enables ultra-fast charging without waiting 12+ months for costly grid transformer upgrades. Uses rooftop solar during the day and low-cost off-peak grid power at night to replenish battery storage, discharging at full power during peak vehicle turnarounds.
Ensures 24/7 continuous operation for electric terminal tractors (AGVs) and reach stackers with dual-gun 600kW fast charging and heavy-duty PowerLock power interfaces.
Acts as an industrial microgrid brain: seamlessly synchronizes local solar PV, existing grid lines, and auxiliary diesel gensets, distributing up to 200kW AC power through 5 standard industrial CEE socket outlets (16A/32A/63A/125A) and PowerLock 400A.
Standard 20'GP container housing 1.075 MWh mega-storage. Delivers sustained 500kW ultra-fast charging for heavy intercity freight trucks along highway corridors with zero transformer overload.
How MPMC BCH eliminates the primary infrastructure, cost, and mobility bottlenecks in commercial vehicle electrification.
Applying for high-voltage grid transformer upgrades often takes 6 to 18 months with exorbitant civil and connection fees, severely delaying electric fleet deployment.
BCH acts as a power buffer reservoir: Draws low-power steady feed (60kW~200kW) from weak grids to deliver instantaneous 150kW~600kW ultra-fast charging. Deploys in days, not years.
Off-grid charging relying on diesel gensets incurs heavy fuel expenses, high maintenance frequency, and heavy carbon/noise emissions that breach environmental regulations.
Hybrid Microgrid Optimization: Maximizes clean solar intake and runs backup diesel generators only at their optimal efficiency curve to recharge the battery buffer, slashing total energy costs by over 50%.
Simultaneous high-power charging (300kW–600kW) of heavy trucks causes severe grid voltage drops, peak load penalties, and risk of transformer tripping.
BCH decouples fast charging from grid capacity: The battery pack absorbs peak charge bursts while maintaining smooth, gentle grid power intake, protecting upstream electrical assets.
Traditional concrete charging stations cannot be relocated when a construction project, mining phase, or temporary lease concludes, resulting in stranded capital.
Turnkey skid/trailer design: Zero civil works required. Relocates seamlessly via trailer or crane truck to follow fleet operations, preserving high residual asset value across decades.
Remote job sites require separate equipment for EV charging, 3-phase machinery, tools, and office lighting, creating complex cabling and maintenance headaches.
Integrated DC & AC dispatch: Dual-gun DC charging (50~1000V) paired with up to 200kW AC 3-phase power output and multiple CEE industrial sockets (16A/32A/63A/125A/PowerLock).
High-power mobile charging in action. Watch how MPMC BCH redefines off-grid fleet management in demanding environments.











