Oct 15, 2026
Charging-as-a-service delivers electric vehicle charging as an on-demand service rather than as fixed infrastructure. Rental companies, leasing operators and charging service providers bring fast charging to logistics hubs, construction sites, events and remote routes, and earn revenue from every kilowatt-hour delivered. MPMC's BCH Series mobile BESS charger is built for exactly this model: a mobile supercharger that combines energy storage and fast charging in one unit and can be deployed anywhere, with no permanent grid connection required.
Grid power, generator sets, battery storage or solar PV charge the BCH's onboard battery, which then delivers fast DC charging to electric vehicles, electric trucks and electric construction machinery while also supplying AC power to other site loads. The range spans 80 kW to 600 kW of DC charging output and 70 kWh to 1,075 kWh of storage, with CCS2 charging guns as standard and CCS1, GB/T or CHAdeMO available to suit each market.
MPMC BCH-275-200 mobile BESS charger on its trailer, charging two electric vehicles at once through dual CCS2 charging guns.Table 1. MPMC BCH Series models for charging-as-a-service operators
| Model | DC charging output | Storage | Charging guns | Mobility and typical service use |
|---|---|---|---|---|
|
BCH-80-70 |
80 kW |
70 kWh |
1 x CCS2, 260 A |
880 kg compact unit, 6 per 20' GP; light EVs and compact sites |
|
BCH-275-200 |
150 kW |
203.5 kWh |
2 x CCS2, 250 A |
3.5 t trailer with forklift pockets; logistics, events and city charging |
|
BCH-600-400 |
400 kW |
407 kWh |
2 x CCS2, 350 A |
8,300 kg; electric trucks and busy charging points |
|
BCH-800-600 |
600 kW |
610.6 kWh |
2 x CCS2, 350 A |
1C charge and discharge; high-intensity truck and machinery charging |
|
BCH-500-1000 |
500 kW |
1,075 kWh |
2 x CCS2, 350 A |
20' GP container; remote routes, mines and construction machinery |
Every BCH model uses blade LFP battery packs in an ultra-strong sandwich architecture, fully tested for fire, water immersion, high-impact collision and crushing. A 65% larger heat-dissipation area and 6.7°C precision temperature control keep output stable, energy density reaches 390 Wh/L, and direct DC-side coupling delivers up to 87% discharge efficiency. Rated for 6,000 cycles at 90% depth of discharge, with sealed liquid-cooled packs and CE-certified aerosol fire protection on the larger models, the BCH is built for the frequent cycling a charging service demands.
A BCH unit reaches full operational status within 24 hours, with no grid reconstruction required. The BCH-275-200's plug-and-play fast output box removes on-site wiring, its 3.5-tonne heavy-duty trailer moves easily across any terrain, and its CCS2 DC input lets it recharge from a fast-charging station in about one hour, making it quick to move a unit from one customer to the next.
BCH units are suited to off-grid and emergency charging, where customers value immediate access to power, and they support premium electricity pricing, micro-grid energy sales and optional RFID payment for commercial customers. Pairing a BCH with solar PV turns zero-cost solar energy into high-value charging revenue, while integrated SCADA and EMS with 4G connectivity, OCPP 1.6 and an open, cloud-ready API keep staffing costs low through automated, remotely managed operation.
Table 2. How the BCH Series supports a charging-as-a-service operation
| Service requirement | BCH capability | Benefit to the service provider |
|---|---|---|
|
Fast set-up at each new site |
Full operation within 24 hours; plug-and-play output box |
More rental days and faster customer start-up |
|
Flexible energy sources |
Grid, genset, BESS or solar input; CCS2 DC recharge in about 1 hour (BCH-275-200) |
Charge wherever the customer is, with or without a grid |
|
Simultaneous vehicle charging |
Dual CCS2 guns on BCH-275-200 and above; DC 50-1,000 V output |
Serve two vehicles at once for higher utilisation |
|
Billing and fleet integration |
OCPP 1.6, 4G EMS, open API, optional RFID payment |
Connects to charging management and billing platforms |
|
Remote, low-labour operation |
Integrated SCADA/EMS; full monitoring and remote command |
Lower staffing cost per charging site |
|
Durable equipment |
C4 anti-corrosion coating (C5 optional on large models); 6,000 cycles at 90% DOD |
Long service life across many rental assignments |
MPMC BCH Series mobile BESS charger fast-charging heavy electric machinery on site.BCH units are already delivering charging services in demanding European applications, from logistics ports to off-grid construction sites. In the UK, a single BCH-275-200 delivered 3,457 kWh, avoiding the 976 litres of diesel an equivalent 150 kW generator would have burned, and saves at least 37.5 tonnes of CO2 a year.
Table 3. Selected MPMC BCH projects
| Project | Configuration | Result |
|---|---|---|
|
Logistics port charging, UK |
8 x BCH-275-200 |
Weak local grid bypassed; EV truck charging moved from 10-hour cycles to near-continuous operation |
|
Rental construction machinery charging, Norway |
BCH Series, 2 MWh; 500 kW and 1,000 kWh per unit; CCS2 output 360 kW / 400 A |
Off-grid charging of electric construction machinery with no diesel generator |
|
Renewable-powered port and logistics charging, Netherlands |
BCH-275-200 + BCH-500-1000 |
EV charging supplied from renewable energy |
|
Solar-storage EV charging station, Netherlands |
BCH Series, 500 kW / 1,000 kWh integrated unit |
Grid-connected solar-plus-storage charging station, 1 MWh |
MPMC serves rental companies, leasing operators and EV charging infrastructure operators as core customer groups, acting as their manufacturing partner while they build and run their own charging services. BCH-275-200, BCH-600-400, BCH-800-600 and BCH-500-1000 units carry a 3-year or 1.6 MWh/kWh system warranty and a 5-year or 2.57 MWh/kWh battery performance warranty with at least 70% capacity retention, backed by remote diagnostics through the SCADA/EMS cloud platform, on-site commissioning by MPMC engineers and APP/Web monitoring. The same supplier also offers generator sets, battery energy storage and hybrid power stations for operators who want to grow a complete temporary power offer.
• Describe your target customers: logistics, construction, events, public charging or remote routes
• Share the vehicles to be charged and the daily energy each customer needs
• Choose the BCH models that match your charging power and mobility needs
• Plan the energy source for each site: grid, genset, battery storage or solar PV
• Connect the units to your billing system through OCPP 1.6 or the open API
• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a proposal
October 26, 2016
The Most Successful Engineering Contractor